| Assessment Year | 1987 |
|---|---|
| Principal Product | DRIED MEAT PRODUCTS |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
n/a
|
| Annual Production | 6,252,000
lb
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $189,683 | 3,660,024 |
kWh
|
$0.052 |
| Natural Gas | $145,382 | 30,823 |
MMBtu
|
$4.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,839 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,467 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2163: Use minimum steam operating pressure | $486 | - | - |
$486
-
MMBtu
|
- | |
| 02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,365 | $45 |
$1,365
25,791
kWh
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $2,130 | $447 | - |
$2,130
-
MMBtu
|
- | |
| 04 | 3.4151: Minimize water usage | $2,826 | $10 | - | - | $2,826 | |
| 05 | 2.2511: Insulate bare equipment | $432 | $190 | - |
$432
-
MMBtu
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $334 | $246 | - |
$334
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $740 | $632 |
$740
14,068
kWh
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $484 | $300 | - |
$484
-
MMBtu
|
- | |
| 09 | 2.3212: Optimize plant power factor | $1,632 | $2,260 |
$1,632
-
kWh
|
- | - | |
| 10 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,940 | $7,000 |
$1,940
37,222
kWh
|
- | - | |
| 11 | 2.4133: Use most efficient type of electric motors | $470 | $927 |
$470
8,792
kWh
|
- | - | |
| TOTAL RECOMMENDED | $12,839 | $12,057 |
$6,147
85,873
kWh
|
$3,866
-
MMBtu
|
$2,826 | ||
| TOTAL IMPLEMENTED | $10,467 | $9,165 |
$3,775
71,805
kWh
|
$3,866
-
MMBtu
|
$2,826 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs