ITAC Assessment: OR0003
ITAC logo
ITAC Assessment: OR0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product DRIED MEAT PRODUCTS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 6,252,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,683 3,660,024
kWh
Natural Gas $145,382 30,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $486 - - $486
-
MMBtu
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,365 $45 $1,365
25,791
kWh
- -
03 2.2511: Insulate bare equipment $2,130 $447 - $2,130
-
MMBtu
-
04 3.4151: Minimize water usage $2,826 $10 - - $2,826
05 2.2511: Insulate bare equipment $432 $190 - $432
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $334 $246 - $334
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $632 $740
14,068
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $484 $300 - $484
-
MMBtu
-
09 2.3212: Optimize plant power factor $1,632 $2,260 $1,632
-
kWh
- -
10 2.2621: Modify refrigeration system to operate at a lower pressure $1,940 $7,000 $1,940
37,222
kWh
- -
11 2.4133: Use most efficient type of electric motors $470 $927 $470
8,792
kWh
- -
TOTAL RECOMMENDED $12,839 $12,057 $6,147
85,873
kWh
$3,866
-
MMBtu
$2,826
TOTAL IMPLEMENTED $10,467 $9,165 $3,775
71,805
kWh
$3,866
-
MMBtu
$2,826
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs