Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 106,389,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,407 9,895,663
kWh
Electricity Demand $110,070 30,375
kW-mo/yr
Electricity Fees $21,533 -
Natural Gas $415,981 117,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $313,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.8112: Combine utility meters $14,609 - - - - - - $14,609 -
02 2.2437: Recover waste heat from equipment $180,287 $358,400 - - $180,287
-
MMBtu
- - - -
03 2.4239: Eliminate or reduce compressed air usage $1,689 $2,080 $998
39,859
kWh
$691
-
kW-mo/yr
- - - - -
04 4.444: Install system to collect scrap $59,893 $12,000 - - - - $59,893 - -
05 2.4133: Use most efficient type of electric motors $5,590 $108,696 $3,905
155,627
kWh
$1,685
-
kW-mo/yr
- - - - -
06 3.4111: Use closed cycle process to minimize waste water production $5,364 $11,500 - - - - - - $5,364
-
Tgal
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $595 $1,275 - - $595
-
MMBtu
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $43,775 $28,880 $69,840
2,793,669
kWh
$30,171
-
kW-mo/yr
$(-56,236.0)
-
MMBtu
- - - -
09 3.5217: Reuse / recycle/ sell paper products $2,190 $1,000 - - - $2,190
-
lb
- - -
TOTAL RECOMMENDED $313,992 $523,831 $74,743
2,989,155
kWh
$32,547
-
kW-mo/yr
$124,646
-
MMBtu
$2,190
-
lb
$59,893 $14,609 $5,364
-
Tgal
TOTAL IMPLEMENTED $7,554 $12,500 - - - $2,190
-
lb
- - $5,364
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs