| Assessment Year | 2022 |
|---|---|
| Principal Product | HEPA Filters |
| NAICS | 541380: Testing Laboratories |
| SIC | 8734: Testing Laboratories |
| Sales Range | less than $500 k |
| # of Employees | 42 |
| Plant Area |
59,757
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $117,720 | 1,759,200 |
kWh
|
$0.067 | |
| Electricity Demand | $40,624 | 3,395 |
kW-mo/yr
|
$11.97 | |
| Natural Gas | $51,540 | 4,359 |
MMBtu
|
$11.82 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,482 | 1,535 |
Tgal
|
$4.22 | |
| TOTAL YEARLY COSTS | $216,366 | ||||
| RECOMMENDED SAVINGS* | $20,189 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $11,400 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $6,342 | $210,000 |
$6,013
89,741
kWh
|
$329
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,723 | $18,748 |
$9,918
148,029
kWh
|
$805
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $677 | $540 |
$677
10,114
kWh
|
- | - | |
| 04 | 2.4321: Upgrade obsolete equipment | $2,447 | $15,480 | - | - |
$2,447
-
MMBtu
|
|
| TOTAL RECOMMENDED | $20,189 | $244,768 |
$16,608
247,884
kWh
|
$1,135
-
kW-mo/yr
|
$2,447
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,400 | $19,288 |
$10,595
158,143
kWh
|
$805
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs