Assessment Year | 1995 |
---|---|
Principal Product | Dental Equipment |
NAICS |
n/a
|
SIC | 3843: Dental Equipment and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
80,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,135 | 1,111,665 |
kWh
|
$0.14 |
Natural Gas | $5,400 | 653 |
MMBtu
|
$8.27 |
Fuel Oil #2 | $15,307 | 2,449 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,051 | $5,270 |
$9,051
64,185
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,091 | $3,576 |
$3,091
21,981
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $431 | $487 |
$431
2,931
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $623 | $700 |
$623
4,396
kWh
|
- | |
05 | 3.1191: Change procedures / equipment / operating conditions | $24,162 | $2,000 | - |
$24,162
-
gal
|
|
TOTAL RECOMMENDED | $37,358 | $12,033 |
$13,196
93,493
kWh
|
$24,162
-
gal
|
||
TOTAL IMPLEMENTED | $12,765 | $9,546 |
$12,765
90,562
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs