Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0876 #08 Y:2013 Use or replace with energy efficient substitutes $41,800 $54,000
OK0876 #07 Y:2013 Change rate schedules or other changes in utility service $1,400 $30
OK0876 #06 Y:2013 Eliminate or reduce compressed air usage $3,040 $645
OK0876 #05 Y:2013 Change rate schedules or other changes in utility service $168 $15
OK0876 #04 Y:2013 Insulate bare equipment $870 $830
OK0876 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,306 $530
OK0876 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $681 $1,600
OK0876 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $9,084 $3,640
DL0124 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $7,125 -
DL0124 #07 Y:2013 Insulate glazing, walls, ceilings, and roofs $760 $1,220
DL0124 #06 Y:2013 Install occupancy sensors $691 $900
DL0124 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,680 -
DL0124 #04 Y:2013 Install timers and/or thermostats $700 $180
DL0124 #03 Y:2013 Enhance sensitivity of temperature control and cutoff $340 -
DL0124 #02 Y:2013 Use optimum temperature $490 -
DL0124 #01 Y:2013 Reschedule plant operations or reduce load to avoid peaks $16,900 -
MI0254 #14 Y:2013 Reduce the pressure of compressed air to the minimum required $447 $80
MI0254 #13 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $727 $1,660
MI0254 #12 Y:2013 Pay bills on time to avoid late fees $1,523 $240
MI0254 #11 Y:2013 Close holes and openings in building such as broken windows $1,914 $520