Assessment Year | 2014 |
---|---|
Principal Product | Biotechnology |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
40,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $942,255 | 4,363,841 |
kWh
|
$0.22 |
Electricity Demand | $65,350 | 8,131 |
kW-mo/yr
|
$8.04 |
Electricity Fees | $82,644 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $180,941 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $150,194 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $66,980 | $10,999 |
$57,162
264,637
kWh
|
$9,818
-
kW-mo/yr
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $45,927 | $80 |
$39,195
181,459
kWh
|
$6,732
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $17,716 | $3,100 |
$15,119
69,997
kWh
|
$2,597
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,333 | $7,040 |
$12,232
56,630
kWh
|
$2,101
-
kW-mo/yr
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,159 | $2,206 |
$10,276
47,771
kWh
|
$883
-
kW-mo/yr
|
- | |
06 | 2.3212: Optimize plant power factor | $5,083 | $7,680 | - |
$5,083
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,680 | $2,160 |
$4,246
19,656
kWh
|
$434
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,949 | $13,170 |
$3,370
15,600
kWh
|
$579
-
kW-mo/yr
|
- | |
09 | 2.7496: Install partitions to reduce size of conditioned space | $3,341 | $600 |
$3,179
14,716
kWh
|
$162
-
kW-mo/yr
|
- | |
10 | 2.7135: Install occupancy sensors | $3,162 | $800 |
$2,696
12,480
kWh
|
$466
-
kW-mo/yr
|
- | |
11 | 2.7444: Close holes and openings in building such as broken windows | $1,914 | $520 |
$1,633
7,561
kWh
|
$281
-
kW-mo/yr
|
- | |
12 | 4.821: Pay bills on time to avoid late fees | $1,523 | $240 | - | - | $1,523 | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $727 | $1,660 |
$443
2,049
kWh
|
$284
-
kW-mo/yr
|
- | |
14 | 2.4231: Reduce the pressure of compressed air to the minimum required | $447 | $80 |
$353
1,634
kWh
|
$94
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $180,941 | $50,335 |
$149,904
694,190
kWh
|
$29,514
-
kW-mo/yr
|
$1,523 | ||
TOTAL IMPLEMENTED | $150,194 | $39,969 |
$122,584
567,512
kWh
|
$26,087
-
kW-mo/yr
|
$1,523 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs