ITAC Assessment: MI0254
ITAC logo
ITAC Assessment: MI0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Biotechnology
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $942,255 4,363,841
kWh
Electricity Demand $65,350 8,131
kW-mo/yr
Electricity Fees $82,644 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $150,194

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7425: Clean or color roof to reduce solar load $66,980 $10,999 $57,162
264,637
kWh
$9,818
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $45,927 $80 $39,195
181,459
kWh
$6,732
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $17,716 $3,100 $15,119
69,997
kWh
$2,597
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,333 $7,040 $12,232
56,630
kWh
$2,101
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $11,159 $2,206 $10,276
47,771
kWh
$883
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $5,083 $7,680 - $5,083
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,680 $2,160 $4,246
19,656
kWh
$434
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,949 $13,170 $3,370
15,600
kWh
$579
-
kW-mo/yr
-
09 2.7496: Install partitions to reduce size of conditioned space $3,341 $600 $3,179
14,716
kWh
$162
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $3,162 $800 $2,696
12,480
kWh
$466
-
kW-mo/yr
-
11 2.7444: Close holes and openings in building such as broken windows $1,914 $520 $1,633
7,561
kWh
$281
-
kW-mo/yr
-
12 4.821: Pay bills on time to avoid late fees $1,523 $240 - - $1,523
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $727 $1,660 $443
2,049
kWh
$284
-
kW-mo/yr
-
14 2.4231: Reduce the pressure of compressed air to the minimum required $447 $80 $353
1,634
kWh
$94
-
kW-mo/yr
-
TOTAL RECOMMENDED $180,941 $50,335 $149,904
694,190
kWh
$29,514
-
kW-mo/yr
$1,523
TOTAL IMPLEMENTED $150,194 $39,969 $122,584
567,512
kWh
$26,087
-
kW-mo/yr
$1,523
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs