Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tanks and tank components
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0180 #08 Y:2017 Turn off equipment when not in use $240 $50
UA0180 #07 Y:2017 Utilize energy-efficient belts and other improved mechanisms $327 $735
UA0180 #06 Y:2017 Pay bills on time to avoid late fees $296 -
UA0180 #05 Y:2017 Modify startup/shutdown times $2,873 -
UA0180 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $12,573 $25,654
UA0180 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $5,029 $400
UA0180 #02 Y:2017 Turn off equipment during breaks, reduce operating time $5,724 $3,250
UA0180 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $8,799 $2,645
UD0929 #07 Y:2015 Turn off equipment during breaks, reduce operating time $290,782 -
UD0929 #06 Y:2015 Reduce space conditioning during non-working hours $658,499 $100,000
UD0929 #05 Y:2015 Analyze flue gas for proper air/fuel ratio $4,522 $12,800
UD0929 #04 Y:2015 Reduce excessive boiler blowdown $61,951 $15,000
UD0929 #03 Y:2015 Install set-back timers $225,530 $1,200
UD0929 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $90,554 $10,250
UD0929 #01 Y:2015 Burn a less expensive grade of fuel $424,424 -
UD0890 #12 Y:2013 Turn off equipment during breaks, reduce operating time $19,159 -
UD0890 #11 Y:2013 Use radiant heater for spot heating $565,879 $1,157,500
UD0890 #10 Y:2013 Reduce space conditioning during non-working hours $746,973 $100,000
UD0890 #09 Y:2013 Use / purchase optimum sized compressor $176,886 $101,000
UD0890 #08 Y:2013 Utilize energy-efficient belts and other improved mechanisms $6,203 -