ITAC Assessment: UD0929
ITAC logo
ITAC Assessment: UD0929
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Defense Combat Vehicles
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3795: Tanks and Tank Components
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 1,600,000
ft2
Annual Production 150
units
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,263,002 46,527,600
kWh
Natural Gas $662,576 146,030
MMBtu
Coal $1,272,701 200,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,756,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,087,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.1331: Burn a less expensive grade of fuel $424,424 - - $(-255,234.0)
-
MMBtu
$679,658
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $90,554 $10,250 - - $90,554
-
MMBtu
03 2.6232: Install set-back timers $225,530 $1,200 $43,855
1,016,580
kWh
$117,604
-
MMBtu
$64,071
-
MMBtu
04 2.1241: Reduce excessive boiler blowdown $61,951 $15,000 - $40,352
-
MMBtu
$21,599
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,522 $12,800 - $4,522
-
MMBtu
-
06 2.7224: Reduce space conditioning during non-working hours $658,499 $100,000 $112,915
2,617,416
kWh
$355,655
-
MMBtu
$189,929
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $290,782 - $58,808
1,363,184
kWh
$150,165
-
MMBtu
$81,809
-
MMBtu
TOTAL RECOMMENDED $1,756,262 $139,250 $215,578
4,997,180
kWh
$413,064
-
MMBtu
$1,127,620
-
MMBtu
TOTAL IMPLEMENTED $1,087,445 $112,800 $112,915
2,617,416
kWh
$104,943
-
MMBtu
$869,587
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs