Assessment Year | 2015 |
---|---|
Principal Product | Defense Combat Vehicles |
NAICS | 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing |
SIC | 3795: Tanks and Tank Components |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
1,600,000
ft2
|
Annual Production | 150
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,263,002 | 46,527,600 |
kWh
|
$0.070 |
Natural Gas | $662,576 | 146,030 |
MMBtu
|
$4.54 |
Coal | $1,272,701 | 200,199 |
MMBtu
|
$6.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,756,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,087,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $424,424 | - | - |
$(-255,234.0)
-
MMBtu
|
$679,658
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $90,554 | $10,250 | - | - |
$90,554
-
MMBtu
|
|
03 | 2.6232: Install set-back timers | $225,530 | $1,200 |
$43,855
1,016,580
kWh
|
$117,604
-
MMBtu
|
$64,071
-
MMBtu
|
|
04 | 2.1241: Reduce excessive boiler blowdown | $61,951 | $15,000 | - |
$40,352
-
MMBtu
|
$21,599
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,522 | $12,800 | - |
$4,522
-
MMBtu
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $658,499 | $100,000 |
$112,915
2,617,416
kWh
|
$355,655
-
MMBtu
|
$189,929
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $290,782 | - |
$58,808
1,363,184
kWh
|
$150,165
-
MMBtu
|
$81,809
-
MMBtu
|
|
TOTAL RECOMMENDED | $1,756,262 | $139,250 |
$215,578
4,997,180
kWh
|
$413,064
-
MMBtu
|
$1,127,620
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,087,445 | $112,800 |
$112,915
2,617,416
kWh
|
$104,943
-
MMBtu
|
$869,587
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs