ITAC Assessment: OD0126
ITAC logo
ITAC Assessment: OD0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Newspaper
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 200,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,294 9,990,621
kWh
Electricity Demand $278,798 19,972
kW-mo/yr
Electricity Fees $48,770 -
Fuel Oil #2 $51,321 12,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,728 $67,670 $7,764
514,361
kWh
$2,964
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $4,241 $570 $4,241
88,511
kWh
- - - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,063 $2,063 $925
61,254
kWh
$1,138
-
kW-mo/yr
- - - -
04 2.3191: Use demand controller or load shedder $3,606 $6,540 $1,163
131,301
kWh
$2,443
-
kW-mo/yr
- - - -
05 2.1116: Improve combustion control capability $1,540 $3,000 - - $1,540
-
MMBtu
- - -
06 3.5316: Contract a wood pallet recycling company $3,000 - - - - - $3,000
-
lb
-
07 3.4145: Use magnetic technology to treat water $1,840 $3,500 - - - $1,840
-
gal
- -
08 4.521: Clear and rent existing space $12,000 - - - - - - $12,000
TOTAL RECOMMENDED $39,018 $83,343 $14,093
795,427
kWh
$6,545
-
kW-mo/yr
$1,540
-
MMBtu
$1,840
-
gal
$3,000
-
lb
$12,000
TOTAL IMPLEMENTED $12,268 $70,670 $7,764
514,361
kWh
$2,964
-
kW-mo/yr
$1,540
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs