ITAC Assessment: GT0902
ITAC logo
ITAC Assessment: GT0902
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Metal Fabrication
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 105,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,304 6,604,931
kWh
Natural Gas $112,974 50,437
MMBtu
TOTAL YEARLY COSTS $596,278
RECOMMENDED SAVINGS* $40,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,435 $6,000 $20,435
279,936
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $19,872 $6,000 $19,872
272,222
kWh
-
03 2.2511: Insulate bare equipment $50 $197 - $50
-
MMBtu
TOTAL RECOMMENDED $40,357 $12,197 $40,307
552,158
kWh
$50
-
MMBtu
TOTAL IMPLEMENTED $50 $197 - $50
-