Assessment Year | 2017 |
---|---|
Principal Product | Pressure Vessels |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3795: Tanks and Tank Components |
Sales Range | $10 M to 50M |
# of Employees | 59 |
Plant Area |
65,000
ft2
|
Annual Production | 60
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,573 | 1,211,940 |
kWh
|
$0.076 |
Electricity Fees | $14,345 | - |
|
- |
Natural Gas | $11,394 | 799 |
MMBtu
|
$14.26 |
TOTAL YEARLY COSTS | $118,312 | |||
RECOMMENDED SAVINGS* | $35,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,662 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,799 | $2,645 |
$8,626
112,932
kWh
|
$173 | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,724 | $3,250 |
$5,612
73,478
kWh
|
$112 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,029 | $400 |
$4,930
64,543
kWh
|
$99 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,573 | $25,654 |
$12,326
161,377
kWh
|
$247 | |
05 | 4.454: Modify startup/shutdown times | $2,873 | - | - | $2,873 | |
06 | 4.821: Pay bills on time to avoid late fees | $296 | - | - | $296 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $327 | $735 |
$321
4,207
kWh
|
$6 | |
08 | 2.6218: Turn off equipment when not in use | $240 | $50 |
$235
3,078
kWh
|
$5 | |
TOTAL RECOMMENDED | $35,861 | $32,734 |
$32,050
419,615
kWh
|
$3,811 | ||
TOTAL IMPLEMENTED | $9,662 | $3,430 |
$9,182
120,217
kWh
|
$480 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs