Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0040 #08 Y:2025 Lower temperature during the winter season and vice-versa $1,066 -
SJ0040 #07 Y:2025 Use solar heat to make electricty $257,368 $1,284,211
SJ0040 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,616 $7,758
SJ0040 #05 Y:2025 Adopt in-house material generation $320,339 $149,572
SJ0040 #04 Y:2025 Recover waste heat from equipment $6,680 $1,717
SJ0040 #03 Y:2025 Install compressor air intakes in coolest locations $369 $1,363
SJ0040 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,664 -
SJ0040 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $6,317 -
MI0452 #10 Y:2024 Use solar heat to make electricty $53,529 $245,201
MI0452 #09 Y:2024 Repair faulty insulation in furnaces, boilers, etc $204 $590
MI0452 #08 Y:2024 Replace existing hvac unit with high efficiency model $5,068 $14,019
MI0452 #07 Y:2024 Improve air circulation with destratification fans / other methods $2,069 $3,165
MI0452 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $14,517 $21,120
MI0452 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,650 $23,081
MI0452 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $6,049 $4,092
MI0452 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,550 $1,660
MI0452 #02 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,989 $960
MI0452 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $5,470 $860
UW2416 #05 Y:2024 Use solar heat to make electricty $54,557 $477,475
UW2416 #04 Y:2024 Initiate a program to acquire iso certification $11,474 $47,500