ITAC Assessment: DL0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product flight simulators and high-value projection displays
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 150,000
ft2
Annual Production 100
units
Production Hrs. Annual 2,860
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,580 4,203,330
kWh
Electricity Demand $64,903 8,590
kW-mo/yr
Electricity Fees $1,462 -
Natural Gas $23,078 2,574
MMBtu
Waste Disposal Costs
Water Usage $3,931 414
Tgal
TOTAL YEARLY COSTS $433,954
RECOMMENDED SAVINGS* $34,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $12,043 - $12,043
148,674
kWh
02 2.6231: Utilize controls to operate equipment only when needed $4,258 - $4,258
52,566
kWh
03 2.7224: Reduce space conditioning during non-working hours $11,703 - $11,703
144,486
kWh
04 2.6242: Minimize operation of equipment maintained in standby condition $4,290 $11,200 $4,290
52,968
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,049 $191 $2,049
21,339
kWh
TOTAL RECOMMENDED $34,343 $11,391 $34,343
420,033
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs