Assessment Year | 2022 |
---|---|
Principal Product | Hardwood Boards |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 12 |
Plant Area |
200,000
ft2
|
Annual Production | 15,000,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,820 | 4,956,791 |
kWh
|
$0.047 |
Electricity Demand | $106,874 | 16,875 |
kW-mo/yr
|
$6.33 |
Electricity Fees | $56,998 | - |
|
- |
TOTAL YEARLY COSTS | $396,692 | |||
RECOMMENDED SAVINGS* | $71,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,994 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $971 | $25 |
$508
10,796
kWh
|
$463
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,106 | $1,000 |
$479
10,189
kWh
|
$627
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $48,358 | $85,000 |
$32,298
687,189
kWh
|
$16,060
-
kW-mo/yr
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $835 | $1,670 |
$613
13,034
kWh
|
$222
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,082 | $16,800 |
$4,379
93,184
kWh
|
$1,703
-
kW-mo/yr
|
|
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,038 | $57,000 |
$11,259
239,558
kWh
|
$2,779
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $71,390 | $161,495 |
$49,536
1,053,950
kWh
|
$21,854
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $8,994 | $19,495 |
$5,979
127,203
kWh
|
$3,015
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs