Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle parts and accessories
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0667 #03 Y:1999 Meter waste water $26,280 $2,980
TN0667 #02 Y:1999 Improve air circulation with destratification fans / other methods $52,782 $80,100
TN0667 #01 Y:1999 Recover and reuse waste material $222,220 $77,760
TN0645 #13 Y:1998 Preheat boiler makeup water with waste process heat $2,780 $14,300
TN0645 #12 Y:1998 Install compressor air intakes in coolest locations $6,310 $1,120
TN0645 #11 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $6,880 $5,000
TN0645 #10 Y:1998 Eliminate leaks in water lines and valves $9,390 $8,000
TN0645 #09 Y:1998 Install set-back timers $15,755 $1,555
TN0645 #08 Y:1998 Treat and reuse rinse waters $28,105 $69,200
TN0645 #07 Y:1998 Use deionized water in upstream rinse tanks $48,650 $120,000
TN0645 #06 Y:1998 Use a different or recycled raw material $51,945 $200,000
TN0645 #05 Y:1998 Initiate a program to acquire iso certification $198,225 $250,000
TN0645 #04 Y:1998 Separate and recycle scrap metal to foundry or for sale $221,455 $70,000
TN0645 #03 Y:1998 Reduce solution drag-out to prevent solution loss $237,600 $153,485
TN0645 #02 Y:1998 Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $277,345 $644,800
TN0645 #01 Y:1998 Allow drainage before withdrawing object $408,630 $24,685
TN0489 #07 Y:1993 Optimize plant power factor $7,337 $13,300
TN0489 #06 Y:1993 Reduce illumination to minimum necessary levels $500 $480
TN0489 #05 Y:1993 Install compressor air intakes in coolest locations $1,488 $380
TN0489 #04 Y:1993 Reduce the pressure of compressed air to the minimum required $3,499 -