ITAC Assessment: TN0489
ITAC logo
ITAC Assessment: TN0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Automotive driveshaft components
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 182
Plant Area 158,400
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,072 9,361,372
kWh
Natural Gas $157,673 29,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $10,207 - $10,207
217,175
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,663 $955 $5,663
120,457
kWh
-
03 2.7261: Install timers and/or thermostats $1,920 $5,250 $441
9,379
kWh
$1,479
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,499 - $3,499
74,443
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,488 $380 $1,488
31,653
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $500 $480 $500
8,499
kWh
-
07 2.3212: Optimize plant power factor $7,337 $13,300 $7,337
-
kWh
-
TOTAL RECOMMENDED $30,614 $20,365 $29,135
461,606
kWh
$1,479
-
MMBtu
TOTAL IMPLEMENTED $13,500 $14,735 $13,500
128,956
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings