Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical equipment for internal combustion engines
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0474 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $967 $6,150
WV0474 #07 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,586 $324
WV0474 #06 Y:2013 Develop a repair/replace policy $1,715 $392
WV0474 #05 Y:2013 Chill water to the highest temperature possible $2,920 $72
WV0474 #04 Y:2013 Utilize energy-efficient belts and other improved mechanisms $3,360 -
WV0474 #03 Y:2013 Establish a predictive maintenance program $5,698 $1,000
WV0474 #02 Y:2013 Eliminate or reduce compressed air usage $9,866 $21,080
WV0474 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $12,986 $15,864
UF0430 #08 Y:2009 Avoid introducing hot, humid, or dirty air into hvac system $6,842 -
UF0430 #07 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $7,016 $404
UF0430 #06 Y:2009 Preheat boiler makeup water with waste process heat $86,549 $4,000
UF0430 #05 Y:2009 Turn off equipment during breaks, reduce operating time $1,211 -
UF0430 #04 Y:2009 Make a practice of turning off lights when not needed $2,547 -
UF0430 #03 Y:2009 Reduce the pressure of compressed air to the minimum required $1,531 -
UF0430 #02 Y:2009 Turn off equipment during breaks, reduce operating time $1,044 -
UF0430 #01 Y:2009 Reduce illumination to minimum necessary levels $28,959 $5,655
OK0639 #06 Y:2002 Change zone reheat coils to variable air volume boxes $6,380 $14,226
OK0639 #05 Y:2002 Install set-back timers $6,583 $160
OK0639 #04 Y:2002 Use computer programs to optimize hvac performance $1,338 $4,126
OK0639 #03 Y:2002 Install occupancy sensors $258 $717