| Assessment Year | 2010 |
|---|---|
| Principal Product | aircraft ignition exciters |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3694: Electrical Equipment for Internal Combustion Engines |
| Sales Range | $5 M to 10M |
| # of Employees | 600 |
| Plant Area |
150,000
ft2
|
| Annual Production | 10,000
units
|
| Production Hrs. Annual | 4,860
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $861,099 | 7,854,933 |
kWh
|
$0.11 |
| Electricity Demand | $160,799 | 17,766 |
kW-mo/yr
|
$9.05 |
| Electricity Fees | $65,259 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $135,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,408 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $28,959 | $5,655 |
$28,959
288,288
kWh
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,044 | - |
$1,044
12,000
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,531 | - |
$1,531
14,051
kWh
|
- | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $2,547 | - |
$2,547
29,285
kWh
|
- | |
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,211 | - |
$1,211
13,925
kWh
|
- | |
| 06 | 2.2441: Preheat boiler makeup water with waste process heat | $86,549 | $4,000 | - |
$86,549
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,016 | $404 |
$7,016
64,366
kWh
|
- | |
| 08 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $6,842 | - |
$6,842
62,779
kWh
|
- | |
| TOTAL RECOMMENDED | $135,699 | $10,059 |
$49,150
484,694
kWh
|
$86,549
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $46,408 | $6,059 |
$46,408
456,718
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs