Assessment Year | 1989 |
---|---|
Principal Product | TITANIUM CASTINGS |
NAICS |
n/a
|
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 171,169
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,400 | 2,706,038 |
kWh
|
$0.049 |
Natural Gas | $32,445 | 6,470 |
MMBtu
|
$5.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,446 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $8,281 | - |
$8,281
242,673
kWh
|
- | |
02 | 2.3191: Use demand controller or load shedder | $2,976 | $200 |
$2,976
-
kWh
|
- | |
03 | 2.3191: Use demand controller or load shedder | $1,940 | $200 |
$1,940
-
kWh
|
- | |
04 | 3.4156: Use flow control valves on equipment to optimize water use | $1,914 | $200 | - | $1,914 | |
05 | 2.4221: Install compressor air intakes in coolest locations | $519 | $250 |
$519
10,551
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $283 | $172 |
$283
5,862
kWh
|
- | |
07 | 2.2514: Cover open tanks | $1,428 | - |
$1,428
41,911
kWh
|
- | |
08 | 2.2444: Use hot process fluids to preheat incoming process fluids | $847 | $1,170 |
$847
17,292
kWh
|
- | |
TOTAL RECOMMENDED | $18,188 | $2,192 |
$16,274
318,289
kWh
|
$1,914 | ||
TOTAL IMPLEMENTED | $15,446 | $1,570 |
$13,532
301,876
kWh
|
$1,914 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs