ITAC Assessment: MI0074
ITAC logo
ITAC Assessment: MI0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Milk processing
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 104
Plant Area 80,000
ft2
Annual Production 26,000
Tgal
Production Hrs. Annual 5,720
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,505 7,803,089
kWh
Electricity Demand $125,303 15,491
kW-mo/yr
Electricity Fees $52,959 -
Natural Gas $204,000 34,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $2,720 $2,100 $2,720
57,080
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,307 - $7,307
112,693
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $14,422 $2,605 $14,422
303,526
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $680 $278 $680
14,310
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,546 $30,200 $9,546
147,211
kWh
-
06 2.1232: Keep boiler tubes clean $18,447 $30,050 - $18,447
-
MMBtu
07 2.4133: Use most efficient type of electric motors $9,115 $9,153 $9,115
149,503
kWh
-
TOTAL RECOMMENDED $62,237 $74,386 $43,790
784,323
kWh
$18,447
-
MMBtu
TOTAL IMPLEMENTED $36,269 $35,033 $17,822
374,916
kWh
$18,447
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs