Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical equipment for internal combustion engines
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0040 #07 Y:1995 Utilize higher efficiency lamps and/or ballasts $302 $684
BD0040 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $494 $450
BD0040 #05 Y:1995 Install occupancy sensors $2,726 $975
BD0040 #04 Y:1995 Reduce combustion air flow to optimum $2,288 $3,000
BD0040 #03 Y:1995 Use most efficient type of electric motors $3,605 $8,310
BD0040 #02 Y:1995 Recover waste heat from equipment $3,916 $3,500
BD0040 #01 Y:1995 Install compressor air intakes in coolest locations $382 $750
WI0210 #08 Y:1994 Utilize energy-efficient belts and other improved mechanisms $112 -
WI0210 #07 Y:1994 Install vinyl strip / high speed / air curtain doors $551 $500
WI0210 #06 Y:1994 Install compressor air intakes in coolest locations $1,288 $1,920
WI0210 #05 Y:1994 Recover waste heat from equipment $1,471 $2,200
WI0210 #04 Y:1994 Install occupancy sensors $625 $375
WI0210 #03 Y:1994 Utilize higher efficiency lamps and/or ballasts $3,328 $5,154
WI0210 #02 Y:1994 Purchase gas directly from a contract gas supplier $5,575 $500
WI0210 #01 Y:1994 Lower temperature during the winter season and vice-versa $5,868 $1,400
WI0186 #09 Y:1993 Turn off equipment during breaks, reduce operating time $322 $200
WI0186 #08 Y:1993 Recover waste heat from equipment $303 $1,200
WI0186 #07 Y:1993 Install compressor air intakes in coolest locations $353 $1,280
WI0186 #06 Y:1993 Replace electrically-operated equipment with fossil fuel equipment $567 $700
WI0186 #05 Y:1993 Install occupancy sensors $211 $372