Assessment Year | 1994 |
---|---|
Principal Product | Remanufactured starters and alternators |
NAICS |
n/a
|
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
48,000
ft2
|
Annual Production | 276,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,280 | 686,987 |
kWh
|
$0.12 |
Natural Gas | $31,088 | 6,224 |
MMBtu
|
$4.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,178 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $5,868 | $1,400 | - |
$5,868
-
MMBtu
|
- | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $5,575 | $500 | - | - | $5,575 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,328 | $5,154 |
$3,328
27,843
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $625 | $375 |
$625
5,275
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $1,471 | $2,200 | - |
$1,471
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,288 | $1,920 |
$1,288
10,844
kWh
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $551 | $500 | - |
$551
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $112 | - |
$112
879
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,818 | $12,049 |
$5,353
44,841
kWh
|
$7,890
-
MMBtu
|
$5,575 | ||
TOTAL IMPLEMENTED | $9,178 | $6,020 |
$1,288
10,844
kWh
|
$7,890
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs