ITAC Assessment: BD0040
ITAC logo
ITAC Assessment: BD0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hourmeters, Heavy duty flashers, Pressure switches, Shifter
NAICS
n/a
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 73,358
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,486 3,301,876
kWh
Natural Gas $15,932 3,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $382 $750 $382
6,448
kWh
-
02 2.2437: Recover waste heat from equipment $3,916 $3,500 - $3,916
-
MMBtu
03 2.4133: Use most efficient type of electric motors $3,605 $8,310 $3,605
60,668
kWh
-
04 2.1113: Reduce combustion air flow to optimum $2,288 $3,000 - $2,288
-
MMBtu
05 2.7135: Install occupancy sensors $2,726 $975 $2,726
45,721
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $494 $450 $494
8,206
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $302 $684 $302
4,982
kWh
-
TOTAL RECOMMENDED $13,713 $17,669 $7,509
126,025
kWh
$6,204
-
MMBtu
TOTAL IMPLEMENTED $7,820 $6,359 $3,904
65,357
kWh
$3,916
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs