Assessment Year | 1993 |
---|---|
Principal Product | Small Motors |
NAICS |
n/a
|
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $10 M to 50M |
# of Employees | 407 |
Plant Area |
150,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,310
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,322 | 4,424,385 |
kWh
|
$0.076 |
Natural Gas | $40,129 | 12,025 |
MMBtu
|
$3.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $14,209 | $15,000 | n/a |
$14,209
247,655
kWh
|
- |
02 | 2.7224: Reduce space conditioning during non-working hours | $12,375 | - | n/a | - |
$12,375
-
MMBtu
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,035 | $10,375 | n/a |
$4,035
53,341
kWh
|
- |
04 | 2.7134: Use photocell controls | $1,100 | $525 | n/a |
$1,100
14,654
kWh
|
- |
05 | 2.7135: Install occupancy sensors | $211 | $372 | n/a |
$211
2,931
kWh
|
- |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $567 | $700 | n/a |
$622
8,206
kWh
|
$(-55.0)
-
MMBtu
|
07 | 2.4221: Install compressor air intakes in coolest locations | $353 | $1,280 | n/a |
$353
4,689
kWh
|
- |
08 | 2.2437: Recover waste heat from equipment | $303 | $1,200 | n/a | - |
$303
-
MMBtu
|
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $322 | $200 | n/a |
$322
23,740
kWh
|
- |
TOTAL RECOMMENDED | $33,475 | $29,652 |
$20,852
355,216
kWh
|
$12,623
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs