Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Storage batteries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0571 #10 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,230 $1,000
CO0571 #09 Y:2005 Use solar heat to heat make-up air $1,540 $14,140
CO0571 #08 Y:2005 Install skylights $6,230 $56,000
CO0571 #07 Y:2005 Install timers and/or thermostats $9,920 $6,000
CO0571 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $18,660 $37,360
CO0571 #05 Y:2005 Heat treat parts only to required specifications or standards $770 $3,000
CO0571 #04 Y:2005 Meter recycled water (to reduce sewer charges) $1,540 $3,240
CO0571 #03 Y:2005 Utilize energy-efficient belts and other improved mechanisms $3,520 $5,600
CO0571 #02 Y:2005 Use most efficient type of electric motors $1,130 $1,560
CO0571 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $7,580 $500
CO0419 #05 Y:1998 Eliminate practice of mixing waste streams $19,614 $27,000
CO0419 #04 Y:1998 Install compressor air intakes in coolest locations $350 $350
CO0419 #03 Y:1998 Consider power loss as well as initial loads and load growth in down-sizing transformers $2,170 $2,820
CO0419 #02 Y:1998 Insulate bare equipment $3,400 $1,120
CO0419 #01 Y:1998 Use demand controller or load shedder $6,930 $6,000
CO0251 #09 Y:1992 Optimize plant power factor $1,320 $2,580
CO0251 #08 Y:1992 Recover waste heat from equipment $190 $690
CO0251 #07 Y:1992 Install adequate dryers on air lines to eliminate blowdown $1,770 $2,270
CO0251 #06 Y:1992 Upgrade controls on compressors $600 $150
CO0251 #05 Y:1992 Use waste heat from hot flue gases to preheat incoming fluids $1,580 $1,100