| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CO0571 #10 Y:2005 | 10 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,230 | $1,000 | |
| CO0571 #09 Y:2005 | 09 | 2005 | Use solar heat to heat make-up air | $1,540 | $14,140 | |
| CO0571 #08 Y:2005 | 08 | 2005 | Install skylights | $6,230 | $56,000 | |
| CO0571 #07 Y:2005 | 07 | 2005 | Install timers and/or thermostats | $9,920 | $6,000 | |
| CO0571 #06 Y:2005 | 06 | 2005 | Utilize higher efficiency lamps and/or ballasts | $18,660 | $37,360 | |
| CO0571 #05 Y:2005 | 05 | 2005 | Heat treat parts only to required specifications or standards | $770 | $3,000 | |
| CO0571 #04 Y:2005 | 04 | 2005 | Meter recycled water (to reduce sewer charges) | $1,540 | $3,240 | |
| CO0571 #03 Y:2005 | 03 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $3,520 | $5,600 | |
| CO0571 #02 Y:2005 | 02 | 2005 | Use most efficient type of electric motors | $1,130 | $1,560 | |
| CO0571 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,580 | $500 | |
| CO0419 #05 Y:1998 | 05 | 1998 | Eliminate practice of mixing waste streams | $19,614 | $27,000 | |
| CO0419 #04 Y:1998 | 04 | 1998 | Install compressor air intakes in coolest locations | $350 | $350 | |
| CO0419 #03 Y:1998 | 03 | 1998 | Consider power loss as well as initial loads and load growth in down-sizing transformers | $2,170 | $2,820 | |
| CO0419 #02 Y:1998 | 02 | 1998 | Insulate bare equipment | $3,400 | $1,120 | |
| CO0419 #01 Y:1998 | 01 | 1998 | Use demand controller or load shedder | $6,930 | $6,000 | |
| CO0251 #09 Y:1992 | 09 | 1992 | Optimize plant power factor | $1,320 | $2,580 | |
| CO0251 #08 Y:1992 | 08 | 1992 | Recover waste heat from equipment | $190 | $690 | |
| CO0251 #07 Y:1992 | 07 | 1992 | Install adequate dryers on air lines to eliminate blowdown | $1,770 | $2,270 | |
| CO0251 #06 Y:1992 | 06 | 1992 | Upgrade controls on compressors | $600 | $150 | |
| CO0251 #05 Y:1992 | 05 | 1992 | Use waste heat from hot flue gases to preheat incoming fluids | $1,580 | $1,100 |