Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Automotive and marine batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 113,900
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $574,200 19,094,882
kWh
Electricity Demand $461,801 31,825
kW-mo/yr
Electricity Fees $2,723 -
Natural Gas $475,189 80,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,580 $500 $4,740
151,000
kWh
$2,840
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $1,130 $1,560 $690
22,100
kWh
$440
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,520 $5,600 $2,200
70,200
kWh
$1,320
-
kW-mo/yr
- - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $1,540 $3,240 - - - $1,540
-
Tgal
- -
05 2.2311: Heat treat parts only to required specifications or standards $770 $3,000 - - $770
-
MMBtu
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $18,660 $37,360 $10,880
346,500
kWh
$6,520
-
kW-mo/yr
- - $670 $590
07 2.7261: Install timers and/or thermostats $9,920 $6,000 - - $9,920
-
MMBtu
- - -
08 2.7145: Install skylights $6,230 $56,000 $2,820
89,700
kWh
$2,770
-
kW-mo/yr
- - $310 $330
09 2.9111: Use solar heat to heat make-up air $1,540 $14,140 - - $1,540
-
MMBtu
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $1,000 $130
4,100
kWh
$80
-
kW-mo/yr
- - - $1,020
TOTAL RECOMMENDED $52,120 $128,400 $21,460
683,600
kWh
$13,970
-
kW-mo/yr
$12,230
-
MMBtu
$1,540
-
Tgal
$980 $1,940
TOTAL IMPLEMENTED $8,810 $1,500 $4,870
155,100
kWh
$2,920
-
kW-mo/yr
- - - $1,020
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs