ITAC Assessment: CO0251
ITAC logo
ITAC Assessment: CO0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Nickel-Cadmium Batteries
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 53,000
ft2
Annual Production 10,900
pieces
Production Hrs. Annual 6,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,480 1,924,678
kWh
Natural Gas $38,318 9,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,080 $250 - - $1,080
02 2.2511: Insulate bare equipment $7,370 $830 $7,190
94,666
kWh
$180
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $2,380 $1,050 $1,050
22,274
kWh
$1,330
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,910 $780 $1,910
25,205
kWh
- -
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,580 $1,100 - $1,580
-
MMBtu
-
06 2.4224: Upgrade controls on compressors $600 $150 $600
12,896
kWh
- -
07 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,770 $2,270 $1,770
37,515
kWh
- -
08 2.2437: Recover waste heat from equipment $190 $690 - $190
-
MMBtu
-
09 2.3212: Optimize plant power factor $1,320 $2,580 - - $1,320
TOTAL RECOMMENDED $18,200 $9,700 $12,520
192,556
kWh
$3,280
-
MMBtu
$2,400
TOTAL IMPLEMENTED $18,200 $9,700 $12,520
192,556
kWh
$3,280
-
MMBtu
$2,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs