ITAC Assessment: CO0419
ITAC logo
ITAC Assessment: CO0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product automotive & marine batteries
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 113,900
ft2
Annual Production 550,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,515 10,166,765
kWh
Electricity Demand $238,017 16,464
kW-mo/yr
Electricity Fees $1,689 -
Natural Gas $118,444 29,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.3191: Use demand controller or load shedder $6,930 $6,000 - $6,930
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $3,400 $1,120 - - $3,400
-
MMBtu
- -
03 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $2,170 $2,820 $960
53,048
kWh
$1,210
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $350 $350 $120
7,034
kWh
$230
-
kW-mo/yr
- - -
05 3.1291: Eliminate practice of mixing waste streams $19,614 $27,000 - - - $478
-
lb
$19,136
-
lb
TOTAL RECOMMENDED $32,464 $37,290 $1,080
60,082
kWh
$8,370
-
kW-mo/yr
$3,400
-
MMBtu
$478
-
lb
$19,136
-
lb
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs