| Assessment Year | 1998 |
|---|---|
| Principal Product | automotive & marine batteries |
| NAICS |
n/a
|
| SIC | 3691: Storage Batteries |
| Sales Range | $10 M to 50M |
| # of Employees | 235 |
| Plant Area |
113,900
ft2
|
| Annual Production | 550,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $179,515 | 10,166,765 |
kWh
|
$0.018 |
| Electricity Demand | $238,017 | 16,464 |
kW-mo/yr
|
$14.46 |
| Electricity Fees | $1,689 | - |
|
- |
| Natural Gas | $118,444 | 29,775 |
MMBtu
|
$3.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $6,930 | $6,000 | - |
$6,930
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2511: Insulate bare equipment | $3,400 | $1,120 | - | - |
$3,400
-
MMBtu
|
- | - | |
| 03 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $2,170 | $2,820 |
$960
53,048
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $350 | $350 |
$120
7,034
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.1291: Eliminate practice of mixing waste streams | $19,614 | $27,000 | - | - | - |
$478
-
lb
|
$19,136
-
lb
|
|
| TOTAL RECOMMENDED | $32,464 | $37,290 |
$1,080
60,082
kWh
|
$8,370
-
kW-mo/yr
|
$3,400
-
MMBtu
|
$478
-
lb
|
$19,136
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs