Assessment Year | 1998 |
---|---|
Principal Product | automotive & marine batteries |
NAICS |
n/a
|
SIC | 3691: Storage Batteries |
Sales Range | $10 M to 50M |
# of Employees | 235 |
Plant Area |
113,900
ft2
|
Annual Production | 550,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,515 | 10,166,765 |
kWh
|
$0.018 |
Electricity Demand | $238,017 | 16,464 |
kW-mo/yr
|
$14.46 |
Electricity Fees | $1,689 | - |
|
- |
Natural Gas | $118,444 | 29,775 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,464 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $6,930 | $6,000 | - |
$6,930
-
kW-mo/yr
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $3,400 | $1,120 | - | - |
$3,400
-
MMBtu
|
- | - | |
03 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $2,170 | $2,820 |
$960
53,048
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $350 | $350 |
$120
7,034
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
05 | 3.1291: Eliminate practice of mixing waste streams | $19,614 | $27,000 | - | - | - |
$478
-
lb
|
$19,136
-
lb
|
|
TOTAL RECOMMENDED | $32,464 | $37,290 |
$1,080
60,082
kWh
|
$8,370
-
kW-mo/yr
|
$3,400
-
MMBtu
|
$478
-
lb
|
$19,136
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs