Assessment Year | 2020 |
---|---|
Principal Product | Water, juice, and carbonated beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
310,000
ft2
|
Annual Production | 35,600,000
pieces
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $734,923 | 16,303,382 |
kWh
|
$0.045 | |
Electricity Demand | $324,982 | 37,111 |
kW-mo/yr
|
$8.76 | |
Electricity Fees | $23,532 | - |
|
- | |
Natural Gas | $256,640 | 62,285 |
MMBtu
|
$4.12 | |
Waste Disposal Costs | |||||
Water Usage | $35 | 5 |
Tgal
|
$7.00 | |
TOTAL YEARLY COSTS | $1,340,112 | ||||
RECOMMENDED SAVINGS* | $66,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $66,199 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $17,410 | $34,210 | - |
$17,410
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,400 | $2,000 |
$13,500
299,000
kWh
|
$3,900
-
kW-mo/yr
|
- | - | |
03 | 2.2441: Preheat boiler makeup water with waste process heat | $9,500 | $20,000 | - | - |
$9,500
-
MMBtu
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,799 | $400 |
$4,129
91,500
kWh
|
$1,670
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $5,725 | $420 |
$4,455
99,000
kWh
|
$1,270
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,280 | $22,200 |
$2,250
50,000
kWh
|
$670
-
kW-mo/yr
|
- | $360 | |
07 | 2.4314: Use synthetic lubricant | $5,500 | $200 |
$3,900
87,600
kWh
|
$1,600
-
kW-mo/yr
|
- | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $860 | $60 |
$550
12,400
kWh
|
$310
-
kW-mo/yr
|
- | - | |
09 | 2.6218: Turn off equipment when not in use | $725 | $730 |
$725
16,100
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $66,199 | $80,220 |
$29,509
655,600
kWh
|
$26,830
-
kW-mo/yr
|
$9,500
-
MMBtu
|
$360 | ||
TOTAL IMPLEMENTED | $66,199 | $80,220 |
$29,509
655,600
kWh
|
$26,830
-
kW-mo/yr
|
$9,500
-
MMBtu
|
$360 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs