ITAC Assessment: NV0170
ITAC logo
ITAC Assessment: NV0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product machine tools
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 40,000
pieces
Production Hrs. Annual 4,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,637 448,000
kWh
Electricity Demand $8,411 1,943
kW-mo/yr
Electricity Fees $1,890 -
Natural Gas $2,512 362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,657 $360 $9,300
113,130
kWh
$1,334
-
kW-mo/yr
$23 -
02 2.2621: Modify refrigeration system to operate at a lower pressure $1,709 $95 $1,709
20,809
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $985 $100 $860
10,551
kWh
$123
-
kW-mo/yr
$2 -
04 3.5311: Recover and reuse waste material $8,109 $14,542 - - - $8,109
-
gal
TOTAL RECOMMENDED $21,460 $15,097 $11,869
144,490
kWh
$1,457
-
kW-mo/yr
$25 $8,109
-
gal
TOTAL IMPLEMENTED $19,751 $15,002 $10,160
123,681
kWh
$1,457
-
kW-mo/yr
$25 $8,109
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs