ITAC Assessment: CC0032
ITAC logo
ITAC Assessment: CC0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Wood Pellets and Industrial Wood Flour
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 110,000
ft2
Annual Production 42,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $477,255 8,600,018
kWh
Electricity Demand $399,613 29,160
kW-mo/yr
Electricity Fees $(-119,537.0) -
TOTAL YEARLY COSTS $757,331
RECOMMENDED SAVINGS* $457,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $15,760 - $10,656
193,739
kWh
$5,104
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,274 $7,400 $2,991
54,380
kWh
$2,283
-
kW-mo/yr
-
03 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $314,706 $1,607,040 $212,778
3,868,699
kWh
$101,928
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,869 $14,141 $9,377
170,491
kWh
$4,492
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,565 $84,000 $32,160
584,721
kWh
$15,405
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $59,248 - $40,059
728,342
kWh
$19,189
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $600 $6,750 - - $600
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $950 $1,000 $642
11,675
kWh
$308
-
kW-mo/yr
-
TOTAL RECOMMENDED $457,971 $1,720,331 $308,662
5,612,047
kWh
$148,709
-
kW-mo/yr
$600
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs