Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic components, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0541 #09 Y:2003 Direct warmest air to combustion intake $523 $72
MA0541 #08 Y:2003 Insulate bare equipment $635 $260
MA0541 #07 Y:2003 Turn off equipment when not in use $4,751 -
MA0541 #06 Y:2003 Use minimum steam operating pressure $5,023 $5,000
MA0541 #05 Y:2003 Recover waste heat from equipment $5,600 $22,000
MA0541 #04 Y:2003 Install compressor air intakes in coolest locations $12,264 $5,500
MA0541 #03 Y:2003 Use cooling tower or economizer to replace chiller cooling $14,763 $14,000
MA0541 #02 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $24,861 $46,350
MA0541 #01 Y:2003 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $89,343 $700,000
MA0428 #05 Y:1998 Adopt in-house material generation $5,618 $29,750
MA0428 #04 Y:1998 Improve space comfort conditioning $5,656 $11,874
MA0428 #03 Y:1998 Recover waste heat from equipment $3,142 $980
MA0428 #02 Y:1998 Reduce illumination to minimum necessary levels $642 $30
MA0428 #01 Y:1998 Install adequate dryers on air lines to eliminate blowdown $1,280 $2,110
MA0355 #07 Y:1995 Install compressor air intakes in coolest locations $62 $102
MA0355 #06 Y:1995 Reuse / recycle/ sell paper products $960 $79
MA0355 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $9,888 $52,000
MA0355 #04 Y:1995 Interlock heating and air conditioning systems to prevent simultaneous operation $5,576 $24,000
MA0355 #03 Y:1995 Lease / purchase baler; sell cardboard to recycler $3,840 $2,200
MA0355 #02 Y:1995 Install equipment (eg compactor) to reduce disposal costs $4,520 $2,700