ITAC Assessment: MA0541
ITAC logo
ITAC Assessment: MA0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Large circuit boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 407
Plant Area 214,000
ft2
Annual Production 420,000
thousand feet
Production Hrs. Annual 8,424
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,834,620 22,271,991
kWh
Electricity Demand $367,805 43,021
kW-mo/yr
Electricity Fees $5,699 -
Natural Gas $680,537 109,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,922

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $89,343 $700,000 n/a $543,042
8,619,711
kWh
$85,000
-
kW-mo/yr
$(-495,600.0)
-
MMBtu
- $(-43,099.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,861 $46,350 $24,861
394,620
kWh
- - - -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $14,763 $14,000 $12,383
196,556
kWh
$2,380
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $12,264 $5,500 - - $12,264
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $5,600 $22,000 n/a - - - $5,600 -
06 2.2163: Use minimum steam operating pressure $5,023 $5,000 - - $5,023
-
MMBtu
- -
07 2.6218: Turn off equipment when not in use $4,751 - $4,751
75,412
kWh
- - - -
08 2.2511: Insulate bare equipment $635 $260 - - $635
-
MMBtu
- -
09 2.1213: Direct warmest air to combustion intake $523 $72 - - $523
-
MMBtu
- -
TOTAL RECOMMENDED $157,763 $793,182 $585,037
9,286,299
kWh
$87,380
-
kW-mo/yr
$(-477,155.0)
-
MMBtu
$5,600 $(-43,099.0)
TOTAL IMPLEMENTED $17,922 $10,760 - - $17,922
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs