Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic components, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0007 #05 Y:2023 Change procedures / equipment / operating conditions $12,000 $7,500
NT0007 #04 Y:2023 Optimize plant power factor $4,290 $5,486
NT0007 #03 Y:2023 Change procedures / equipment / operating conditions $22,470 -
NT0007 #02 Y:2023 Replace existing hvac unit with high efficiency model $63,856 $337,512
NT0007 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,184 $5,993
OK0892 #13 Y:2014 Insulate bare equipment $2,848 $899
OK0892 #12 Y:2014 Replace electrically-operated equipment with fossil fuel equipment $3,648 $10,200
OK0892 #11 Y:2014 Recover waste heat from equipment $3,802 $10,000
OK0892 #10 Y:2014 Install / repair insulation on steam lines $167 $660
OK0892 #09 Y:2014 Replace boiler $3,189 $14,400
OK0892 #08 Y:2014 Install timers and/or thermostats $148 $160
OK0892 #07 Y:2014 Clean and maintain refrigerant condensers and towers $105 $28
OK0892 #06 Y:2014 Install outside air damper / economizer on hvac unit $2,109 $2,560
OK0892 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,294 $3,969
OK0892 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,538 $1,619
OK0892 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,809 $7,935
OK0892 #02 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $1,055 $560
OK0892 #01 Y:2014 Recover waste heat from equipment $635 $689
AM0559 #06 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $6,245 $500
AM0559 #05 Y:2009 Make a practice of turning off lights when not needed $1,810 $500