Assessment Year | 2009 |
---|---|
Principal Product | Engine controllers |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | greater than $500 M |
# of Employees | 900 |
Plant Area |
320,000
ft2
|
Annual Production | 1,100,000,000
pieces
|
Production Hrs. Annual | 7,776
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,957,312 | 34,254,454 |
kWh
|
$0.057 |
Electricity Demand | $348,809 | 54,303 |
kW-mo/yr
|
$6.42 |
Electricity Fees | $64,568 | - |
|
- |
Natural Gas | $8,160 | 744 |
MMBtu
|
$10.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $105,655 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79,100 | $225,000 |
$67,400
1,183,000
kWh
|
$11,700
-
kW-mo/yr
|
|
02 | 2.6218: Turn off equipment when not in use | $24,500 | - |
$24,500
430,000
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,800 | $15 |
$9,200
161,000
kWh
|
$1,600
-
kW-mo/yr
|
|
04 | 2.6218: Turn off equipment when not in use | $7,700 | - |
$7,700
135,200
kWh
|
- | |
05 | 2.7124: Make a practice of turning off lights when not needed | $1,810 | $500 |
$1,510
26,500
kWh
|
$300
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,245 | $500 |
$5,320
93,400
kWh
|
$925
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $130,155 | $226,015 |
$115,630
2,029,100
kWh
|
$14,525
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $105,655 | $226,015 |
$91,130
1,599,100
kWh
|
$14,525
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs