Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic components, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0453 #11 Y:2014 Lease / purchase baler; sell cardboard to recycler $5,040 $6,500
BD0453 #10 Y:2014 Recharge batteries on during off-peak demand periods $160 $20
BD0453 #09 Y:2014 Install occupancy sensors $349 $375
BD0453 #08 Y:2014 Utilize higher efficiency lamps and/or ballasts $447 $470
BD0453 #07 Y:2014 Install compressor air intakes in coolest locations $585 $250
BD0453 #06 Y:2014 Reduce the pressure of compressed air to the minimum required $586 $20
BD0453 #05 Y:2014 Use photocell controls $1,020 $500
BD0453 #04 Y:2014 Use synthetic lubricant $3,554 $500
BD0453 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $4,753 $8,550
BD0453 #02 Y:2014 Improve air circulation with destratification fans / other methods $8,131 $1,000
BD0453 #01 Y:2014 Replace existing hvac unit with high efficiency model $15,619 $115,000
BD0405 #06 Y:2011 Replace existing hvac unit with high efficiency model $3,704 $40,000
BD0405 #05 Y:2011 Reduce the pressure of compressed air to the minimum required $82 $10
BD0405 #04 Y:2011 Install occupancy sensors $2,161 $1,050
BD0405 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $7,286 $15,356
BD0405 #02 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,415 $7,299
BD0405 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,816 $4,065
BD0197 #06 Y:2001 Pay bills on time to avoid late fees $418 -
BD0197 #05 Y:2001 Install occupancy sensors $144 $450
BD0197 #04 Y:2001 Turn off equipment during breaks, reduce operating time $229 $157