Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic components, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0605 #07 Y:2025 Minimize operation of equipment maintained in standby condition $64 $260
AS0605 #06 Y:2025 Conserve energy by efficient use of vending machines $431 $818
AS0605 #05 Y:2025 Turn off equipment when not in use $583 $2,577
AS0605 #04 Y:2025 Install timers and/or thermostats $929 $2,002
AS0605 #03 Y:2025 Improve air circulation with destratification fans / other methods $2,531 $210
AS0605 #02 Y:2025 Optimize plant power factor $6,580 $17,986
AS0605 #01 Y:2025 Utilize a less expensive cooling method $14,690 $25,500
SJ0033 #10 Y:2024 Check for accuracy of utility / power meters $88,611 -
SJ0033 #09 Y:2024 Keep doors and windows shut when not on use $1,191 -
SJ0033 #08 Y:2024 Install equipment (eg compactor) to reduce disposal costs $57,302 $150,000
SJ0033 #07 Y:2024 Reduce space conditioning during non-working hours $39,875 -
SJ0033 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,984 $316
SJ0033 #05 Y:2024 Turn off equipment when not in use $2,035 -
SJ0033 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,277 -
SJ0033 #03 Y:2024 Use solar heat to make electricty $123,902 $507,150
SJ0033 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $13,071 $384
SJ0033 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,132 $39,246
UU0262 #08 Y:2024 Optimize plant power factor $5,129 $12,300
UU0262 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,117 $834
UU0262 #06 Y:2024 Minimize operation of equipment maintained in standby condition $720 $1,680