ITAC Assessment: DS0049
ITAC logo
ITAC Assessment: DS0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Heat Conductive Material & Circuit Board Plates
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 55,000
ft2
Annual Production 563,200
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,606 3,278,429
kWh
Electricity Demand $65,971 10,325
kW-mo/yr
Electricity Fees $5,730 -
Natural Gas $199,893 90,663
MMBtu
LPG $7,500 1,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $3,012 $6,282 $1,848
59,496
kWh
$1,164
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,752 $14,574 $3,578
115,475
kWh
$2,174
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $483 $1,200 $483
15,533
kWh
- - -
04 2.4224: Upgrade controls on compressors $629 $20 $288
7,327
kWh
- $341
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $25,792 $80,000 $(-3,615.0)
(-81,477)
kWh
- $29,407
-
MMBtu
-
06 3.1175: Use a different or recycled raw material $31,200 - - - - $31,200
-
lb
TOTAL RECOMMENDED $66,868 $102,076 $2,582
116,354
kWh
$3,338
-
kW-mo/yr
$29,748
-
MMBtu
$31,200
-
lb
TOTAL IMPLEMENTED $66,868 $102,076 $2,582
116,354
kWh
$3,338
-
kW-mo/yr
$29,748
-
MMBtu
$31,200
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs