Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Semiconductors and related devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0257 #05 Y:2025 Install timers and/or thermostats $291 $131
DL0257 #04 Y:2025 Use optimum temperature $1,329 -
DL0257 #03 Y:2025 Utilize controls to operate equipment only when needed $343 -
DL0257 #02 Y:2025 Reduce space conditioning during non-working hours $4,000 -
DL0257 #01 Y:2025 Use solar heat to make electricty $58,383 $470,000
DL0190 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,730 $2,453
DL0190 #07 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $560 $550
DL0190 #06 Y:2021 Turn off equipment when not in use $270 -
DL0190 #05 Y:2021 Use or replace with energy efficient substitutes $361 $1,200
DL0190 #04 Y:2021 Reduce space conditioning during non-working hours $1,650 -
DL0190 #03 Y:2021 Utilize controls to operate equipment only when needed $324 $50
DL0190 #02 Y:2021 Utilize controls to operate equipment only when needed $2,910 -
DL0190 #01 Y:2021 Utilize controls to operate equipment only when needed $180 -
LE0240 #09 Y:2006 Utilize higher efficiency lamps and/or ballasts $21,770 $139,872
LE0240 #08 Y:2006 Repair faulty insulation in furnaces, boilers, etc $192 $300
LE0240 #07 Y:2006 Utilize energy-efficient belts and other improved mechanisms $331 $300
LE0240 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $4,994 $500
LE0240 #05 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $7,178 $4,500
LE0240 #04 Y:2006 Reschedule plant operations or reduce load to avoid peaks $8,308 $2,500
LE0240 #03 Y:2006 Use / purchase optimum sized compressor $18,974 $2,092