ITAC Assessment: LE0240
ITAC logo
ITAC Assessment: LE0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product solar cells and solar panels
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 306
Plant Area 135,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,121 13,861,638
kWh
Electricity Demand $351,163 58,369
kW-mo/yr
Natural Gas $93,559 7,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $401,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $305,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Water Consumption Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $265,405 $500,000 - - $94,112 $36,176
-
Tgal
$135,117
02 2.7233: Use properly designed and sized hvac equipment $74,790 $800 $54,343
1,552,666
kWh
$20,447
-
kW-mo/yr
- - -
03 2.4226: Use / purchase optimum sized compressor $18,974 $2,092 $13,911
397,452
kWh
$5,063
-
kW-mo/yr
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,308 $2,500 - $8,308
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,178 $4,500 $5,394
154,104
kWh
$1,784
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,994 $500 $4,000
114,292
kWh
$994
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $331 $300 $262
7,492
kWh
$69
-
kW-mo/yr
- - -
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $192 $300 $192
5,511
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $21,770 $139,872 $16,359
467,401
kWh
$5,411
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $401,942 $650,864 $94,461
2,698,918
kWh
$42,076
-
kW-mo/yr
$94,112 $36,176
-
Tgal
$135,117
TOTAL IMPLEMENTED $305,382 $510,192 $23,759
678,851
kWh
$16,218
-
kW-mo/yr
$94,112 $36,176
-
Tgal
$135,117
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Water Consumption Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs