ITAC Assessment: MI0153
ITAC logo
ITAC Assessment: MI0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Bakery Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 65,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,439 4,242,750
kWh
Electricity Demand $93,304 11,519
kW-mo/yr
Electricity Fees $1,321 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $369,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2622: Replace existing chiller with high efficiency model $342,569 $290,000 $163,550
1,068,955
kWh
$179,019
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,866 $54,000 $15,848
103,584
kWh
$2,018
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $5,256 $260 $4,800
31,477
kWh
$456
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,348 $1,074 $3,098
20,248
kWh
$250
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $628 $2,610 $500
2,432
kWh
$128
-
kW-mo/yr
TOTAL RECOMMENDED $369,667 $347,944 $187,796
1,226,696
kWh
$181,871
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs