ITAC Assessment: WI0313
ITAC logo
ITAC Assessment: WI0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 41,954
ft2
Annual Production 240,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,989 371,630
kWh
Electricity Demand $26,526 2,162
kW-mo/yr
Electricity Fees $1,447 -
Natural Gas $8,596 1,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7251: Reduce air conditioning load by evaporating water from roof $4,445 $7,155 $2,448
53,927
kWh
$2,182
-
kW-mo/yr
$(-185.0)
-
Tgal
-
02 2.7241: Install outside air damper / economizer on hvac unit $4,183 $4,200 $766
16,999
kWh
$3,417
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,208 $2,000 $638
14,068
kWh
$570
-
kW-mo/yr
- -
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,667 $2,000 $653
14,361
kWh
$1,014
-
kW-mo/yr
- -
05 3.7137: Replace cloth rags with paper towels $256 - - - - $256
06 4.821: Pay bills on time to avoid late fees $251 - - - - $251
TOTAL RECOMMENDED $12,010 $15,355 $4,505
99,355
kWh
$7,183
-
kW-mo/yr
$(-185.0)
-
Tgal
$507
TOTAL IMPLEMENTED $7,571 $11,155 $3,739
82,356
kWh
$3,766
-
kW-mo/yr
$(-185.0)
-
Tgal
$251
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs