Assessment Year | 1998 |
---|---|
Principal Product | Commercial Printing |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
41,954
ft2
|
Annual Production | 240,000
lb
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,989 | 371,630 |
kWh
|
$0.043 |
Electricity Demand | $26,526 | 2,162 |
kW-mo/yr
|
$12.27 |
Electricity Fees | $1,447 | - |
|
- |
Natural Gas | $8,596 | 1,692 |
MMBtu
|
$5.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,571 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7251: Reduce air conditioning load by evaporating water from roof | $4,445 | $7,155 |
$2,448
53,927
kWh
|
$2,182
-
kW-mo/yr
|
$(-185.0)
-
Tgal
|
- | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $4,183 | $4,200 |
$766
16,999
kWh
|
$3,417
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,208 | $2,000 |
$638
14,068
kWh
|
$570
-
kW-mo/yr
|
- | - | |
04 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $1,667 | $2,000 |
$653
14,361
kWh
|
$1,014
-
kW-mo/yr
|
- | - | |
05 | 3.7137: Replace cloth rags with paper towels | $256 | - | - | - | - | $256 | |
06 | 4.821: Pay bills on time to avoid late fees | $251 | - | - | - | - | $251 | |
TOTAL RECOMMENDED | $12,010 | $15,355 |
$4,505
99,355
kWh
|
$7,183
-
kW-mo/yr
|
$(-185.0)
-
Tgal
|
$507 | ||
TOTAL IMPLEMENTED | $7,571 | $11,155 |
$3,739
82,356
kWh
|
$3,766
-
kW-mo/yr
|
$(-185.0)
-
Tgal
|
$251 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs