Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

857

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printed circuit boards
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0996 #08 Y:2025 Use solar heat to make electricty $69,446 $597,013
GT0996 #07 Y:2025 Replace existing hvac unit with high efficiency model $61,043 $300,000
GT0996 #06 Y:2025 Use most efficient type of electric motors $929 $3,845
GT0996 #05 Y:2025 Eliminate or reduce compressed air usage $2,898 $9,000
GT0996 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,931 $15,250
GT0996 #03 Y:2025 Use most efficient type of electric motors $1,956 $3,845
GT0996 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,373 $2,600
GT0996 #01 Y:2025 Conserve energy by efficient use of vending machines $245 $90
SF0630 #05 Y:2024 Use solar heat to make electricty $235,065 $1,065,176
SF0630 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,310 $2,631
SF0630 #03 Y:2024 Turn off equipment when not in use $22,379 $883
SF0630 #02 Y:2024 Turn off equipment when not in use $8,005 -
SF0630 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,052 -
SU0562 #12 Y:2024 Use solar heat to make electricty $36,470 $266,289
SU0562 #11 Y:2024 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $437 $2,900
SU0562 #10 Y:2024 Use solar heat to make electricty $291 $1,234
SU0562 #09 Y:2024 Insulate bare equipment $639 $2,272
SU0562 #08 Y:2024 Install an uninteruptable power supply $25,000 $80,000
SU0562 #07 Y:2024 Install compressor air intakes in coolest locations $419 $632
SU0562 #06 Y:2024 Install back-up equipment $75,000 $86,000