Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

889

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printed circuit boards
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0614 #09 Y:2026 Install occupancy sensors $74 $53
AS0614 #08 Y:2026 Install spectral reflectors / delamp $107 $18
AS0614 #07 Y:2026 Replace broken windows and/or window sash $654 $105
AS0614 #06 Y:2026 Insulate bare equipment $755 $3,123
AS0614 #05 Y:2026 Conserve energy by efficient use of vending machines $1,404 $1,245
AS0614 #04 Y:2026 Make a practice of turning off lights when not needed $2,428 $405
AS0614 #03 Y:2026 Eliminate or reduce compressed air usage $2,900 $140
AS0614 #02 Y:2026 Install timers on light switches in little used areas $7,253 $6,917
AS0614 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,757 $13,649
SJ0044 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,270 -
SJ0044 #04 Y:2026 Eliminate or reduce compressed air usage $460 -
SJ0044 #03 Y:2026 Combine utility meters $14,808 -
SJ0044 #02 Y:2026 Use battery storage for demand control $7,754 $81,200
SJ0044 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $12,715 $18,778
NT0051 #06 Y:2025 Lower temperature during the winter season and vice-versa $586 -
NT0051 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,986 $5,609
NT0051 #04 Y:2025 Optimize plant power factor $2,603 $6,709
NT0051 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $12,814 -
NT0051 #02 Y:2025 Replace existing hvac unit with high efficiency model $32,918 $193,830
NT0051 #01 Y:2025 Reduce scrap production $98,944 $80,000