ITAC Assessment: NT0048
ITAC logo
ITAC Assessment: NT0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Integrated Racks
NAICS 334419: Other Electronic Component Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 844,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,353 16,456,613
kWh
Electricity Demand $245,126 30,205
kW-mo/yr
Electricity Fees $124,939 -
Natural Gas $76,791 7,909
MMBtu
Waste Disposal Costs
Water Usage $768,125 33,682
Tgal
TOTAL YEARLY COSTS $1,769,334
RECOMMENDED SAVINGS* $377,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,298 - $1,728
51,269
kWh
$570
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,633 $5,609 $8,769
257,646
kWh
$2,864
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $998 $1,346 - - - $998
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $13,913 $73,500 $1,795
53,277
kWh
$589
-
kW-mo/yr
- $11,528
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $20,312 $55,710 $14,667
435,212
kWh
$5,646
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $7,122 $25,622 - $7,122
-
kW-mo/yr
- -
07 2.8121: Apply for tax-free status for energy purchases $321,458 $5,000 - - $321,458 -
TOTAL RECOMMENDED $377,736 $166,787 $26,959
797,404
kWh
$16,792
-
kW-mo/yr
$321,458 $12,527
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs