Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Telephone and telegraph apparatus
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0039 #06 Y:2015 Use fossil fuel powered generator during peak demand periods $6,679 $6,839
IP0039 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,262 $3,790
IP0039 #04 Y:2015 Install compressor air intakes in coolest locations $2,314 $1,524
IP0039 #03 Y:2015 Install occupancy sensors $330 $128
IP0039 #02 Y:2015 Shut off cooling if cold outside air will cool process $6,224 $853
IP0039 #01 Y:2015 Reduce the pressure of compressed air to the minimum required $1,933 -
DL0096 #05 Y:2012 Repair and eliminate steam leaks $766 $270
DL0096 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,791 $500
DL0096 #03 Y:2012 Keep equipment clean $2,296 $1,200
DL0096 #02 Y:2012 Recover waste heat from equipment $1,176 $8,000
DL0096 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $6,429 $30,095
LE0106 #06 Y:2001 Use properly designed and sized hvac equipment $6,293 $41,225
LE0106 #05 Y:2001 Install occupancy sensors $961 $1,250
LE0106 #04 Y:2001 Use separate switches on perimeter lighting which may be turned off when natural light is available $9,638 -
LE0106 #03 Y:2001 Utilize higher efficiency lamps and/or ballasts $6,150 $4,410
LE0106 #02 Y:2001 Install compressor air intakes in coolest locations $561 $640
LE0106 #01 Y:2001 Use less wasteful packaging $1,700 -
SF0186 #03 Y:2000 Reuse / recycle/ sell paper products $5,385 $150
SF0186 #02 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $444 $1,100
SF0186 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,145 $3,370