Assessment Year | 2001 |
---|---|
Principal Product | Electronics |
NAICS |
n/a
|
SIC | 3661: Telephone and Telegraph Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 249 |
Plant Area |
104,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,512 | 2,419,624 |
kWh
|
$0.077 |
Electricity Demand | $7,736 | 776 |
kW-mo/yr
|
$9.97 |
Natural Gas | $30,586 | 3,404 |
MMBtu
|
$8.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,749 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1162: Use less wasteful packaging | $1,700 | - | - | - | - |
$1,700
-
lb
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $561 | $640 |
$423
6,048
kWh
|
$138
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,150 | $4,410 |
$4,672
60,678
kWh
|
$1,478
-
kW-mo/yr
|
- | - | |
04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $9,638 | - |
$9,638
125,174
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $961 | $1,250 |
$961
12,480
kWh
|
- | - | - | |
06 | 2.7233: Use properly designed and sized hvac equipment | $6,293 | $41,225 | - | - |
$6,293
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,303 | $47,525 |
$15,694
204,380
kWh
|
$1,616
-
kW-mo/yr
|
$6,293
-
MMBtu
|
$1,700
-
lb
|
||
TOTAL IMPLEMENTED | $16,749 | $5,660 |
$15,271
198,332
kWh
|
$1,478
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs