| Assessment Year | 1983 |
|---|---|
| Principal Product | DEBONED CHICKEN |
| NAICS |
n/a
|
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $10 M to 50M |
| # of Employees | 54 |
| Plant Area |
n/a
|
| Annual Production | 52,000,000
lb
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,941 | 3,028,136 |
kWh
|
$0.054 |
| Natural Gas | $20,550 | 4,584 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $11,771 | $49,000 |
$11,771
217,761
kWh
|
- | |
| 02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $382 | $200 |
$382
7,034
kWh
|
- | |
| 03 | 2.2135: Repair and eliminate steam leaks | $334 | $100 | - |
$334
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $225 | $133 | - |
$225
-
MMBtu
|
|
| 05 | 2.2122: Install / repair insulation on condensate lines | $148 | $85 | - |
$148
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,860 | $49,518 |
$12,153
224,795
kWh
|
$707
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs