ITAC Assessment: GT0174
ITAC logo
ITAC Assessment: GT0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product DEBONED CHICKEN
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area
n/a
Annual Production 52,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,941 3,028,136
kWh
Natural Gas $20,550 4,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $11,771 $49,000 $11,771
217,761
kWh
-
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $382 $200 $382
7,034
kWh
-
03 2.2135: Repair and eliminate steam leaks $334 $100 - $334
-
MMBtu
04 2.2511: Insulate bare equipment $225 $133 - $225
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $148 $85 - $148
-
MMBtu
TOTAL RECOMMENDED $12,860 $49,518 $12,153
224,795
kWh
$707
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs