ITAC Assessment: IP0039
ITAC logo
ITAC Assessment: IP0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Telecommunications and Automotive Assemblies
NAICS 334210: Telephone Apparatus Manufacturing
SIC 3661: Telephone and Telegraph Apparatus
Sales Range greater than $500
M
# of Employees 700
Plant Area 113,280
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,172 1,011,982
kWh
Electricity Demand $31,625 2,650
kW-mo/yr
Electricity Fees $6,468 -
Natural Gas $9,462 1,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,933 - $1,703
26,958
kWh
$230
-
kW-mo/yr
-
02 2.2691: Shut off cooling if cold outside air will cool process $6,224 $853 $6,224
98,487
kWh
- -
03 2.7135: Install occupancy sensors $330 $128 $330
5,229
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,314 $1,524 $2,224
35,193
kWh
$90
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,262 $3,790 $2,194
34,724
kWh
$1,068
-
kW-mo/yr
-
06 2.3192: Use fossil fuel powered generator during peak demand periods $6,679 $6,839 $1,858
29,400
kWh
$8,640
-
kW-mo/yr
$(-3,819.5)
-
MMBtu
TOTAL RECOMMENDED $20,743 $13,134 $14,533
229,991
kWh
$10,029
-
kW-mo/yr
$(-3,819.5)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs