Assessment Year | 2015 |
---|---|
Principal Product | Telecommunications and Automotive Assemblies |
NAICS | 334210: Telephone Apparatus Manufacturing |
SIC | 3661: Telephone and Telegraph Apparatus |
Sales Range | greater than $500 M |
# of Employees | 700 |
Plant Area |
113,280
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,172 | 1,011,982 |
kWh
|
$0.064 |
Electricity Demand | $31,625 | 2,650 |
kW-mo/yr
|
$11.93 |
Electricity Fees | $6,468 | - |
|
- |
Natural Gas | $9,462 | 1,132 |
MMBtu
|
$8.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,933 | - |
$1,703
26,958
kWh
|
$230
-
kW-mo/yr
|
- | |
02 | 2.2691: Shut off cooling if cold outside air will cool process | $6,224 | $853 |
$6,224
98,487
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $330 | $128 |
$330
5,229
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,314 | $1,524 |
$2,224
35,193
kWh
|
$90
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,262 | $3,790 |
$2,194
34,724
kWh
|
$1,068
-
kW-mo/yr
|
- | |
06 | 2.3192: Use fossil fuel powered generator during peak demand periods | $6,679 | $6,839 |
$1,858
29,400
kWh
|
$8,640
-
kW-mo/yr
|
$(-3,819.5)
-
MMBtu
|
|
TOTAL RECOMMENDED | $20,743 | $13,134 |
$14,533
229,991
kWh
|
$10,029
-
kW-mo/yr
|
$(-3,819.5)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs