Assessment Year | 2000 |
---|---|
Principal Product | plastic enclosures |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 89 |
Plant Area |
90,000
ft2
|
Annual Production | 1,560,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,439 | 2,329,719 |
kWh
|
$0.025 |
Electricity Demand | $5,005 | 281 |
kW-mo/yr
|
$17.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $356,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $213,117 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $34,250 | $131,500 | - | - |
$34,250
-
lb
|
- | - | |
02 | 4.445: Install equipment to move product | $211,827 | $100,400 | - | - | - | $211,827 | - | |
03 | 2.2691: Shut off cooling if cold outside air will cool process | $29,380 | $27,925 |
$28,330
833,236
kWh
|
$1,050
-
kW-mo/yr
|
- | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $23,435 | $12,800 |
$20,380
599,355
kWh
|
$3,055
-
kW-mo/yr
|
- | - | - | |
05 | 3.1192: Reduce scrap production | $29,580 | - | - | - |
$29,580
-
lb
|
- | - | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $20,548 | $1,075 |
$7,593
223,329
kWh
|
- | - | - | $12,955 | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,871 | - |
$2,461
72,392
kWh
|
$410
-
kW-mo/yr
|
- | - | - | |
08 | 2.2511: Insulate bare equipment | $1,965 | $735 |
$1,965
50,996
kWh
|
- | - | - | - | |
09 | 2.6218: Turn off equipment when not in use | $1,290 | - |
$1,110
32,532
kWh
|
$180
-
kW-mo/yr
|
- | - | - | |
10 | 2.7261: Install timers and/or thermostats | $1,250 | $1,500 |
$1,250
32,532
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $356,396 | $275,935 |
$63,089
1,844,372
kWh
|
$4,695
-
kW-mo/yr
|
$63,830
-
lb
|
$211,827 | $12,955 | ||
TOTAL IMPLEMENTED | $213,117 | $100,400 |
$1,110
32,532
kWh
|
$180
-
kW-mo/yr
|
- | $211,827 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs