ITAC Assessment: TN0688
ITAC logo
ITAC Assessment: TN0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product plastic enclosures
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 90,000
ft2
Annual Production 1,560,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,439 2,329,719
kWh
Electricity Demand $5,005 281
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $356,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $213,117

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.5311: Recover and reuse waste material $34,250 $131,500 - - $34,250
-
lb
- -
02 4.445: Install equipment to move product $211,827 $100,400 - - - $211,827 -
03 2.2691: Shut off cooling if cold outside air will cool process $29,380 $27,925 $28,330
833,236
kWh
$1,050
-
kW-mo/yr
- - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $23,435 $12,800 $20,380
599,355
kWh
$3,055
-
kW-mo/yr
- - -
05 3.1192: Reduce scrap production $29,580 - - - $29,580
-
lb
- -
06 4.611: Begin a practice of predictive / preventative maintenance $20,548 $1,075 $7,593
223,329
kWh
- - - $12,955
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,871 - $2,461
72,392
kWh
$410
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $1,965 $735 $1,965
50,996
kWh
- - - -
09 2.6218: Turn off equipment when not in use $1,290 - $1,110
32,532
kWh
$180
-
kW-mo/yr
- - -
10 2.7261: Install timers and/or thermostats $1,250 $1,500 $1,250
32,532
kWh
- - - -
TOTAL RECOMMENDED $356,396 $275,935 $63,089
1,844,372
kWh
$4,695
-
kW-mo/yr
$63,830
-
lb
$211,827 $12,955
TOTAL IMPLEMENTED $213,117 $100,400 $1,110
32,532
kWh
$180
-
kW-mo/yr
- $211,827 -