Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

462

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Communications equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0447 #06 Y:1994 Install compressor air intakes in coolest locations $283 $116
KU0447 #05 Y:1994 Reduce the pressure of compressed air to the minimum required $824 $150
KU0447 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $191 $300
KU0447 #03 Y:1994 Install occupancy sensors $914 $990
KU0447 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,023 $1,325
KU0447 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $7,417 $35,256
AS0132 #08 Y:1994 Replace existing hvac unit with high efficiency model $13,845 $32,760
AS0132 #07 Y:1994 Install timers and/or thermostats $3,483 $1,715
AS0132 #06 Y:1994 Utilize higher efficiency lamps and/or ballasts $3,194 $5,166
AS0132 #05 Y:1994 Use photocell controls $142 $120
AS0132 #04 Y:1994 Utilize energy-efficient belts and other improved mechanisms $3,170 -
AS0132 #03 Y:1994 Use most efficient type of electric motors $22,467 $23,982
AS0132 #02 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $1,073 $770
AS0132 #01 Y:1994 Use or replace with energy efficient substitutes $29,169 $75,000
MA0318 #07 Y:1994 Install equipment (eg compactor) to reduce disposal costs $2,520 $383
MA0318 #06 Y:1994 Change procedures / equipment / operating conditions $6,000 $500
MA0318 #05 Y:1994 Use radiant heater for spot heating $1,100 $1,410
MA0318 #04 Y:1994 Optimize plant power factor $2,338 $4,349
MA0318 #03 Y:1994 Recover waste heat from equipment $3,319 $521
MA0318 #02 Y:1994 Use optimum size and capacity equipment $7,659 $3,520