ITAC Assessment: KU0447
ITAC logo
ITAC Assessment: KU0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cellular telephones
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 47,700
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,245 1,871,923
kWh
Natural Gas $9,357 2,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,417 $35,256 $7,417
132,474
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,023 $1,325 $1,023
13,775
kWh
03 2.7135: Install occupancy sensors $914 $990 $914
20,809
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $191 $300 $191
1,758
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $824 $150 $824
18,757
kWh
06 2.4221: Install compressor air intakes in coolest locations $283 $116 $283
6,448
kWh
07 2.2511: Insulate bare equipment $631 $497 $631
14,361
kWh
TOTAL RECOMMENDED $11,283 $38,634 $11,283
208,382
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs